Filed under: Investing
General Electric is eager to begin a desert campaign.
On Tuesday, the industrial behemoth announced that it has signed a $700 million contract to supply the Saudi Electricity Company with additional F-class combined-cycle gas turbines, associated equipment, and related services.
GE turbines are already in place at Saudi Electricity's power plants Nos. 9 through 12. And indeed, GE boasts that "GE equipment assists in the generation of more than half of Saudi Arabia's power supply."
Now, GE says it expects its equipment to "provide significant fuel savings and lower emissions" at Saudi Electricity's large, combined-cycle power plants Nos. 13 and 14 as well, helping the customer to produced 3.8 gigawatts of electric power from natural gas. The new "PP13" and "PP14" will feature 12 GE 7F-5 gas turbines, four GE steam turbines, and 16 generators.
GE will begin delivering the turbines in early 2015. It will also provide maintenance services at both PP13 and PP14 for eight years, the cost of which is included in the overall quote of $700 million.
The article General Electric Wins $700 Million Saudi Contract originally appeared on Fool.com.
Fool contributor Rich Smith has no position in any stocks mentioned. The Motley Fool owns shares of General Electric. Try any of our Foolish newsletter services free for 30 days. We Fools don't all hold the same opinions, but we all believe that considering a diverse range of insights makes us better investors. The Motley Fool has a disclosure policy.Copyright © 1995 - 2013 The Motley Fool, LLC. All rights reserved. The Motley Fool has a disclosure policy.
Read | Permalink | Email this | Linking Blogs | Comments